| Wayang Windu - Drilling a wildcat on top of Wayang - 2200m ASL. |
|
... on the planet at 44MW. The other 5 are more than twice as powerful as the average well in Iceland or NZ. Star Energy has now moved the rig to the top of a mountain to wildcat a discovery well at the source of this field. I am the Drilling Supervisor.
|




